February 2009: Searching for electrons - beam adjustment

2009-02-12_01 Marco is going to adjust the position of the electron-positron converter.

Marco is going to adjust the position of the electron-positron converter.

2009-02-12_02 The electron-positron converter first time in position for adjustment

The electron-positron converter first time in position for adjustment

2009-02-12_03 The electron-positron converter (left-down) close to the positron extraction lens. Illuminated hole in the left: electron beam entrance window (flange is dismounted).

The electron-positron converter (left-down) close to the positron extraction lens. Illuminated hole in the left: electron beam entrance window (flange is dismounted).

2009-02-12_04 The electron-positron converter seen through the electron entrance window (Be window flange is dismounted).

The electron-positron converter seen through the electron entrance window (Be window flange is dismounted).

2009-02-12_05 A fraction of the lead shielding must be removed again.

A fraction of the lead shielding must be removed again.

2009-02-12_06 The electron beam line to the positron target.

The electron beam line to the positron target.

2009-02-12_07 The electron beam line to the positron target.

The electron beam line to the positron target.

2009-02-12_08 The electron beam line to the positron target.

The electron beam line to the positron target.

2009-02-12_09 The electron beam line to the positron target.

The electron beam line to the positron target.

2009-02-12_10 The electron beam line and the electron-positron converter stage.

The electron beam line and the electron-positron converter stage.

2009-02-12_11 Marco Jungmann and Benno Werlich (left) during converter adjustment.

Marco Jungmann and Benno Werlich (left) during converter adjustment.

2009-02-12_12

2009-02-12_13 Final electron beam diagnostic stage.

Final electron beam diagnostic stage.

2009-02-12_14 Electron beam line. In the background: the positron converter.

Electron beam line. In the background: the positron converter.

2009-02-12_15 The labview PC for beam adjustment.

The labview PC for beam adjustment.

2009-02-12_16 The beam line in th lab. The electron gun is mounted on the top.

The beam line in th lab. The electron gun is mounted on the top.

2009-02-12_17 The lab 111d.

The lab 111d.