2008-07-02_01 Nicki, playing with lead bricks...

Nicki, playing with lead bricks...

2008-07-02_02 Did you ever see a 125-ton door moving?

Did you ever see a 125-ton door moving?

2008-07-02_03 ... almost closed ...

... almost closed ...

2008-07-02_04 Cave 111b/c is locked.

Cave 111b/c is locked.

2008-07-02_05 Marco riding the beam dump ...

Marco riding the beam dump ...

2008-07-02_06 All together we will have 15 tons of lead.

All together we will have 15 tons of lead.

2008-07-02_07 Maik at fine tuning.

Maik at fine tuning.

2008-07-02_08 The earth field corrections coils at the converter chamber are visible.

The earth field corrections coils at the converter chamber are visible.

2008-07-02_09 The electron beam line to the positron converter is ready for use. The copper part in the end (lower frame edge) is the beam dump suitable up to 200W beam power (diagnostic mode of ELBE).

The electron beam line to the positron converter is ready for use. The copper part in the end (lower frame edge) is the beam dump suitable up to 200W beam power (diagnostic mode of ELBE).

2008-07-02_10 Teamwork...

Teamwork...

2008-07-02_11 Lead screening almost finished.

Lead screening almost finished.

2008-07-02_12 An Al plate supports the heavy concrete bricks.

An Al plate supports the heavy concrete bricks.

2008-07-02_13 The current state of the Pb screening.

The current state of the Pb screening.