Wolfgang Anwand joins the EPOS construction team
Each brick has 20 kg - just like a crate of beer.
The bricks get numbers ...
... to be composed the next time in a similar way.
A lattice defect - must be annealed...
Not so much missing any more.
The racks get more units in.
The cable channel beneath the 3.2m concrete wall. View from the lab.
Cable connections in the cable channel in the lab.
All this lead must still be processed ...
... sometimes two strong men are not sufficient.
A lead break ...
Wolfgang lifts up one ton of lead.