2008-04-02_01 Nicki and Stefan preparing for work ...

Nicki and Stefan preparing for work ...

2008-04-02_02 Arnold ready to shift tons of lead out of the lab.

Arnold ready to shift tons of lead out of the lab.

2008-04-02_03 Nicki mounting the cable channel for the magnet power supplies.

Nicki mounting the cable channel for the magnet power supplies.

2008-04-02_04 The bow saw now in continous action.

The bow saw now in continous action.

2008-04-02_05 We added an automatic cooling / greasing system to make the sawing easy.

We added an automatic cooling / greasing system to make the sawing easy.

2008-04-02_06 Lead waiting for processing.

Lead waiting for processing.

2008-04-02_07 Cable channel is ready.

Cable channel is ready.

2008-04-02_08 Stefan looking quiet clever...

Stefan looking quiet clever...

2008-04-02_09 Dancing in the cave ...

Dancing in the cave ...

2008-04-02_10 The first layer of lead nearly completed.

The first layer of lead nearly completed.

2008-04-02_11 Participants of the EPOS-Miniworkshop visting the ELBE hall. RKR explaining the neutron time-of-flight spectrometer.

Participants of the EPOS-Miniworkshop visting the ELBE hall. RKR explaining the neutron time-of-flight spectrometer.

2008-04-02_12 RKR showing the cave 111b...

RKR showing the cave 111b...

2008-04-02_13 ... and the positron converter.

... and the positron converter.

2008-04-02_14 Cave 111b

Cave 111b

2008-04-02_15 The positron lab still having almost no installation.

The positron lab still having almost no installation.

2008-04-02_16 All the guys preparing for departure.

All the guys preparing for departure.

2008-04-02_17 Marco full of enthusiasm after a hard day listing talks.

Marco full of enthusiasm after a hard day listing talks.

2008-04-02_18 Tube arts ...

Tube arts ...

2008-04-02_19 Stefan resting and ...

Stefan resting and ...

2008-04-02_20 ... being awaked by his mobile.

... being awaked by his mobile.

2008-04-02_21 Converter chamber being removed to weld the leak.

Converter chamber being removed to weld the leak.

2008-04-02_22 Aluminum beam dump...

Aluminum beam dump...

2008-04-02_23 Beam line to the positron lab.

Beam line to the positron lab.

2008-04-02_24 Converter chamber waiting for transport to the workshop.

Converter chamber waiting for transport to the workshop.

2008-04-02_25 Cave setup looks like 2 month before   ;-(

Cave setup looks like 2 month before ;-(