2008-02-27_01 The electron-positron converter

The electron-positron converter

2008-02-27_02 Inside of ion getter pump

Inside of ion getter pump

2008-02-27_03 Wolfgang Anwand (left) visiting the construction site

Wolfgang Anwand (left) visiting the construction site

2008-02-27_04 Michael Freitag, Dr. Schlenk, Marco Jungmann and Maik Butterling (from left to right)

Michael Freitag, Dr. Schlenk, Marco Jungmann and Maik Butterling (from left to right)

2008-02-27_05 Marco Jungmann & Maik Butterling installing the ion getter pump

Marco Jungmann & Maik Butterling installing the ion getter pump

2008-02-27_06 coarse adjustment of beam dump

coarse adjustment of beam dump

2008-02-27_07 Instruments for fine adjustments installed

Instruments for fine adjustments installed

2008-02-27_08 Dr. Voigtländer doing the setting of the tools for beam line adjustments

Dr. Voigtländer doing the setting of the tools for beam line adjustments

2008-02-27_09 Beam dump

Beam dump

2008-02-27_10 Beam line adjustment

Beam line adjustment

2008-02-27_11 Final adjustment gave a beam deviation of the Be windows of only 0.17 in y-direction, and 0.10 mm in x-direction.

Final adjustment gave a beam deviation of the Be windows of only 0.17 in y-direction, and 0.10 mm in x-direction.

2008-02-27_12 First leak test of recently installed parts: everything okay.

First leak test of recently installed parts: everything okay.

2008-02-27_13 Maik and Marco looking for the success of vacuum testing

Maik and Marco looking for the success of vacuum testing

2008-02-27_14 Extraction lens

Extraction lens

2008-02-27_15 Extraction lens

Extraction lens

2008-02-27_16 Extraction lens

Extraction lens

2008-02-27_17 The ELBE command center

The ELBE command center

2008-02-27_18 ELBE entrance room

ELBE entrance room

2008-02-27_19 ELBE electron beam buncher

ELBE electron beam buncher

2008-02-27_20 First 20 MeV accelerator

First 20 MeV accelerator

2008-02-27_21 ... second 20 MeV accelerator

... second 20 MeV accelerator

2008-02-27_22 Electron bam switch

Electron bam switch

2008-02-27_23 Feedtrough to Cave 111b (neutron and positron beamline)

Feedtrough to Cave 111b (neutron and positron beamline)

2008-02-27_24 Nuclear physics control room

Nuclear physics control room

2008-02-27_25 the future positron lab

the future positron lab

2008-02-27_26 Gamma detector at positron lab wall is part of interlock system

Gamma detector at positron lab wall is part of interlock system

2008-02-27_27 Beam line connected to converter chamber

Beam line connected to converter chamber

2008-02-27_28 The most difficult flange

The most difficult flange

2008-02-27_29 New bolts are needed for this flange connection

New bolts are needed for this flange connection

2008-02-27_30 Setup almost completed

Setup almost completed

2008-02-27_31 Final connection to pre-vacuum still missing

Final connection to pre-vacuum still missing

2008-02-27_32 Ion getter pump will be inside the radiation shielding

Ion getter pump will be inside the radiation shielding

2008-02-27_33 Final connection to pre-vacuum still missing

Final connection to pre-vacuum still missing

2008-02-27_34 The first lead block of the radiation shield in position:

The first lead block of the radiation shield in position: "cornerstone ceremony"

2008-02-27_35 Shield is growing

Shield is growing