2008-02-14_01 Stefan holding the converter chamber

Stefan holding the converter chamber

2008-02-14_02

2008-02-14_03 Water cooling pipes

Water cooling pipes

2008-02-14_04 Beam dump without converter chamber

Beam dump without converter chamber

2008-02-14_05 Marco mounting flanges

Marco mounting flanges

2008-02-14_06

2008-02-14_07 Converter chamber is mounted to the beam

Converter chamber is mounted to the beam

2008-02-14_08 Marco handling the torque spanning

Marco handling the torque spanning

2008-02-14_09 First vacuum test failed: there were leaks

First vacuum test failed: there were leaks

2008-02-14_10 Spot of adjusting laser hits the center of Be entrance window

Spot of adjusting laser hits the center of Be entrance window

2008-02-14_11 Leak testing

Leak testing

2008-02-14_12 Finally we found three leaks - system tight

Finally we found three leaks - system tight

2008-02-14_13 Cave 111b - left: electron beam line to positron facility

Cave 111b - left: electron beam line to positron facility